Geothermal Projects


Divider


  Site: Imperial College, Hammersmith Campus, Du Cane Road, London
Client: Imperial College Limited
Date: January – February 2009
Scope Two Open Loop Geothermal Wells

Magpie Drilling successfully procured, coordinated and delivered the drilling of 2 open loop wells for a ground source energy scheme at Imperial College’s Hammersmith Campus. Drilling was carried out using a Comacchio MC3000 with 10m beko rods and carousel handling system.

The construction consisted of the drilling and installation of 324mm OD mild steel casing through the tertiary deposits of the London Basin to a depth of 80m to engage with water bearing competent chalk deposits below. The holes were started off with rotary flight augers to approximately 50m below ground level and finished to the top of the chalk deposits with rotary mud flush using clay inhibitors, filtration polymers and also bentonite products to achieve borehole stability and cutting returns. Once the 324mm OD casing had been securely grouted in place the hole was completed using rotary water flush techniques within the chalk aquifer to the completion depth of 140m. Once the boreholes were complete, the wells were acidized and developed to achieve the required pumping yields.

All the works were undertaken on a very sensitive and constricted site that was bounded by a “blue route” that transports patients to the cardiac arrest emergency response centre. Works were carried out with careful consideration to noise levels at the site boundary and specific pre planned and approved procedures of work for all operations, logistics and movements. The works were completed without any complaints and Magpie Drilling were thanked for their efforts and successful delivery of the project.


Divider


  Site: Heston School
Client: Cool-Planet Technologies Limited
Date: Jan – May 2009 (two visits)
Scope 48 x 100m Closed Loop wells

Drilling and installation of 48 x 100m deep closed loop borehole field for an existing School. Following the successful installation of the test borehole Magpie were retained as the geothermal drilling contractor. The drilling works were completed well ahead of programme after careful selection and development of the mud drilling programme. Following the successful implementation of the drilling works Magpie were then retained to carry out the headerworks for the borehole field and provided Construction Quality Assurance testing of the system.


Divider


  Site: Eaton Square, Belgravia, London.
Client: Holloway White Allom
Date: February 2008
Scope 2 Open Loop wells

Magpie’s services have been retained by Holloway White Allom Limited for the drilling, installation and pump testing of 2 open loop geothermal wells for supplying ground sourced heating and cooling capability at some of Grosvenor’s luxury domestic properties around the square. Following several planning meetings to ensure the project team formed a close working group, initial geophysical surveys to locate deep buried services organised by Magpie have been successfully completed.


Divider


  Site: Easter Business Park, Aldermaston.
Client: Mitie Air Conditioning
Date: October 2007
Scope 61 Closed Loop Holes

Drilling and installation of a 61 closed loop 105m deep borehole field for a new development of 17 separate offices. Working as the geothermal drilling contractor with Mitie who were employed as the M&E Installation Contractor the drilling works were completed on programme. Following the successful implementation of the drilling works Magpie were then retained to carry out the headerworks for the borehole field and provided Construction Quality Assurance testing of the system.


Divider


  Site: 100 George Street , Croydon
Client: Kier London
Date: May 2007
Scope Scope: 4 Open Loop Wells

Successful drilling and installation of a total of 4 open loop wells to approximately 140m with a finished hole diameter of 300mm for a commercial development in Croydon. Working as the geothermal drilling contractor for Kiers London the works included the drilling and installation of 40m of steel casing and a final drilled depth of 140m into the chalk and the subsequent development and acidisation to maximise the productivity of the wells. This was then closely followed by a thorough test pumping programme to ensure the yield available from the wells was sufficient for the needs of the development.


Divider


Site: 10 and 30 Eastbourne Terrace, Paddington
Client: Wates Construction Limited
Date: 2007
Scope 28 Very Deep Closed Loop Bores

Drilling and installation of 18 closed loop borehole field to 155 - 177m with Wates Construction Limited for the 10 Eastbourne Terrace development. Following the high service levels and professional attitude given by our drilling crews on site Magpie were then retained to drill and install 10 closed loop boreholes to 170m for the development of 30 Eastbourne Terrace and also to drill and install a 160m groundwater extraction well to supply non potable water to the developments.

 
     


















BSI
Chas
Chas
environmental drilling, landfill drilling, magpie, renewable energy, open loop, geothermal boreholes, closed loop, groundwater, abstraction, wells, environmental, monitoring, landfill, gas, extraction, leach ate, venting
    Copyright 2009 
environmental drilling, landfill drilling, magpie, renewable energy, open loop, geothermal boreholes, closed loop, groundwater, abstraction, wells, environmental, monitoring, landfill, gas, extraction, leach ate, venting, British, Association, England, Scotland, UK, full, Corporate, Member
Website Design Newcastle, North East